Financial Transparency

Budget & Financial Transparency

Tracking Concepcion's public finances from official sources. This page is new: we publish figures only with their source, and add more as records are found.

What Public Sources Report

Secondary sources so far. Each needs to be checked against BLGF or COA records.

Annual Revenue (2024)
₱65.52M
Unverified: Wikipedia infobox
Revenue Growth (2023)
66%
Highest in Romblon (DOF data reported by PIA)
Real Property Tax Efficiency (2023)
36%
Lowest in Romblon (DOF data reported by PIA)
Regular Income (2016)
₱37.36M
PhilAtlas

Budget by Barangay

Each of Concepcion's 9 barangays has its own annual budget and a share of the National Tax Allotment. These peso figures have not been published online yet. We add each one with its source as soon as it is found.

Bachawan

358 residents (2020 census)

Annual barangay budget
Not yet published
National Tax Allotment share
Not yet published
Projects reported
None reported yet

Calabasahan

568 residents (2020 census)

Annual barangay budget
Not yet published
National Tax Allotment share
Not yet published
Projects reported
₱25M road upgrade (with San Pedro); Gaylang water system; covered court

Dalajican

295 residents (2020 census)

Annual barangay budget
Not yet published
National Tax Allotment share
Not yet published
Projects reported
Covered court

Masadya

182 residents (2020 census)

Annual barangay budget
Not yet published
National Tax Allotment share
Not yet published
Projects reported
Covered court

Masudsud

268 residents (2020 census)

Annual barangay budget
Not yet published
National Tax Allotment share
Not yet published
Projects reported
Masursor Arch Bridge (no public funds)

Poblacion

866 residents (2020 census)

Annual barangay budget
Not yet published
National Tax Allotment share
Not yet published
Projects reported
None reported yet

Sampong

333 residents (2020 census)

Annual barangay budget
Not yet published
National Tax Allotment share
Not yet published
Projects reported
None reported yet

San Pedro (Agbatang)

434 residents (2020 census)

Annual barangay budget
Not yet published
National Tax Allotment share
Not yet published
Projects reported
₱25M road upgrade (with Calabasahan); covered court

San Vicente

257 residents (2020 census)

Annual barangay budget
Not yet published
National Tax Allotment share
Not yet published
Projects reported
None reported yet

What we checked (25 Nov 2026). The FY 2027 national budget proposal lists public works for Romblon only as totals for the whole Romblon District Engineering Office, not by town or barangay (BetterGov Budget search). Barangay shares of the National Tax Allotment are issued by DBM in its local budget memorandums; the Concepcion figures have not been extracted yet.

Where the barangay budget is. Every barangay must post its approved annual budget on its Full Disclosure Policy board at the barangay hall, and anyone can request a copy. If you have a photo or copy, please share it on GitHub so it can be added here with its source.

Projects in Concepcion

Projects and their status as reported by the municipality's Public Information Office. Amounts are shown only where the LGU published them.

Circumferential road, San Pedro to Calabasahan

₱25,000,000

Widening and upgrading of about 900 metres of road with 1.5-metre shoulders, serving 331 households (1,125 residents). Funded by the FY 2026 Local Government Support Fund – Growth Equity Fund (LGSF-GEF).

Under construction (site inspection, August 2026)

Gaylang water system, Calabasahan

Amount not published

A Small Water Impounding Project (SWIP) dam at Gaylang feeds a new water filtration facility that pipes treated water to homes. Water quality was tested at the facility before a full system test.

Testing (July 2026)

Masursor Arch Bridge, Sapangpalay, Masudsud

No public funds

A self-supporting timber arch based on a Leonardo da Vinci design, built without nails or permanent fasteners. Most of the timber is donated or reused ROMELCO power poles.

Opened (August 2026)

Covered courts in Masadya, Dalajican, San Pedro and Calabasahan

Amount not published

Inspected by Representative Eleandro Jesus Madrona and Mayor Fameronag together with barangay officials.

Inspected (August 4, 2026)

Pabahay housing project

Amount not published

Disaster-resilient homes for families relocated from high-risk coastal and watershed areas. The first three families received certificates of award.

First units turned over (November 9, 2026)

Proposed RoPax ferry

Not yet funded

A modern steel-hulled roll-on/roll-off passenger ferry for Concepcion, discussed with ferry operators and investment groups.

Proposal (October 22, 2026)

Source: Concepcion Public Information Office posts, July–November 2026. Contracts and costs still need checking against DPWH, PhilGEPS and COA records. Know of a project that is missing? Open an issue on GitHub.